Kent County Council has secured £20 million from the government to reconfigure the Port of Dover’s eastern docks, with the work expected to slash the frequency and duration of Operation Brock and Dover TAP by up to 80% during normal operations.
Drivers on the M20 and residents in Folkestone and Dover could see far fewer days of lorry queues and contraflow hell after Kent County Council signed off a major port improvement scheme on 7 July 2026. The £20 million comes from the Department for Transport’s Levelling Up Fund — KCC isn’t putting in a penny of its own money — and the Port of Dover will carry out the actual construction work.
The Dover Border Access Improvement Project will reconfigure border control facilities in the eastern docks, creating more vehicle processing booths and queuing space for the equivalent of over 500 lorries. All kept inside the Port. No more spillage onto the A20 and M20.
Peter Osborne, KCC’s Cabinet Member for Highways and Transport, signed the key decision to proceed after the Growth, Environment and Transport Cabinet Committee met on 7 July. He called it “the beginning of the end for Operation Brock as we’ve come to know it” and “a significant milestone for Dover, for Kent and for the resilience of one of the UK’s most important trade routes.”
Operation Brock and Dover TAP — the traffic management arrangements that effectively turn stretches of the M20 into a lorry park — won’t disappear entirely. Both will still be needed during severe weather, industrial action in France or ferry disruptions. But under normal conditions, the scheme should cut how often and how long those measures run by up to 80%. Which, for anyone who’s sat in a contraflow outside Folkestone on a bank holiday Friday, is not nothing.
KCC says improved journey reliability should extend along the M20 corridor through Folkestone and as far inland as Maidstone, with businesses and communities tied to cross-Channel freight and passenger movements standing to benefit.
The Port of Dover will now deliver the improvement works.
Dover gets £20m to cut Operation Brock by up to 80% Quiz
5 questions